Tuesday, 13 July 2010

Small Adjustments

Front exhaust fitted, oil pipes and electrical wires zip tied under frame, rear muddy removed ready for new brackets. Need to locate some 10mm copper pipe to run oil lines from oil tank to pump so that it goes up and over the battery all a tight fit. So need it to look as clean as poss.

No comments: